Over the same time period, between autumn 2011 and late summer 2013, an entirely new supply centre was built for the body shop, the supply centre for assembly was built, and the assembly area itself was extended. Another milestone of the factory was construction of the “body shop supply centre” which is 280 metres long and 36 metres wide.